HMS Raleigh, the Royal Navy’s premier training establishment in Cornwall, is cutting its carbon footprint by using renewable energy to heat its swimming pool.
Specified by Wessex Design Ltd, Kier Group PLC’s specialist energy solutions team supplied Vaillant solar thermal panels, Secon Solar controllers and Bowman heat exchangers for the 33m pool.
The heating for the pool at HMS Raleigh was previously taken off the main boiler on site so the decision was made to use renewable energy.
Read the full story on Swimming Pool News
[adrotate group=”4″]